01 / SET-OUT
Start with the layout.
Think through the starting point, cut tiles and where the lines will meet before laying begins.
What Perth Tiling & Stone does
Supply and lay, or lay only if you have already bought your tiles. Residential and small commercial, anywhere in the Perth metro.

Strip-out to finished room

Subway, stacked or mosaic

Large-format porcelain

Patios, pools and steps

Certified before tiling

Small jobs welcome
Order of work
Each one has to cure or pass a check before the next starts. It is why a bathroom takes the days it takes, and why skipping a stage shows up two years later.
02 / THE DETAILS
The parts you notice every day.
And the preparation underneath.
01 / SET-OUT
Think through the starting point, cut tiles and where the lines will meet before laying begins.
02 / PREPARATION
The base matters. We’ll discuss surface preparation and what your room needs before the tiles go on.
03 / FINISH
Grout joints, edges and transitions deserve the same attention as the tiles themselves.
A layout drawn here. A conversation about your actual space next.
Tell us about itSend a photo of the room. Perth Tiling & Stone will tell you whether it is a retile, a repair, or something you can leave another year.
Pick a finish first
A diagonal lay wastes 15% more tile than a stack bond. Worth seeing the options before you buy.